    Wu Jinghong, Ye Shaomin, Zhang Jiqing, Zhao Qing, Zhang Wenxuan. Structural Health Monitoring of Large-Section Tunnel of Jingxiong High-Speed Railway Based on Fiber Bragg Grating Monitoring Technology[J]. Laser & Optoelectronics Progress, 2020, 57(21): 210603 Copy Citation Text show less
    Sectional circumferential strain monitoring. (a) FBG strain gauge; (b) layout of strain gauges in tunnel section; (c) installation of strain gauge
    Fig. 1. Sectional circumferential strain monitoring. (a) FBG strain gauge; (b) layout of strain gauges in tunnel section; (c) installation of strain gauge
    Structural diagram of FBG displacement meter
    Fig. 2. Structural diagram of FBG displacement meter
    Monitoring of bidirectional displacement of deformation joints. (a) layout of displacement meter in tunnel section; (b) FBG displacement meter; (c) installation of bidirectional displacement meter
    Fig. 3. Monitoring of bidirectional displacement of deformation joints. (a) layout of displacement meter in tunnel section; (b) FBG displacement meter; (c) installation of bidirectional displacement meter
    Layered settlement monitoring. (a) Layout of layered settlement meter and bedrock mark; (b) FBG static level
    Fig. 4. Layered settlement monitoring. (a) Layout of layered settlement meter and bedrock mark; (b) FBG static level
    Layout of sensors for structural health monitoring of Jingxiong high-speed railway tunnel with large section
    Fig. 5. Layout of sensors for structural health monitoring of Jingxiong high-speed railway tunnel with large section
    Average strain of 14 measurement points at DK51 + 907 cross section varying with time during filling
    Fig. 8. Average strain of 14 measurement points at DK51 + 907 cross section varying with time during filling
    Internal force changes of 14 measurement points at DK51 + 907 cross section during filling. (a) Axial force; (b) bending moment
    Fig. 9. Internal force changes of 14 measurement points at DK51 + 907 cross section during filling. (a) Axial force; (b) bending moment
    Measurement pointStrain during pouring /μεMeasurement pointStrain during pouring /με
    MaximumAverageMinimumMaximumAverageMinimum
    18.7-13.8-29.1
    223.3-10.1-27.8146.5-34.251.8
    3-0.6-30.2-40.413-0.5-29.2-41.7
    4-0.9-26.9-34.6120.0-29.0-38.2
    5-0.2-6.5-9.911-0.1-7.1-10.1
    6-0.2-6.0-9.010-0.1-5.0-6.9
    75.23.20.194.83.2-0.2
    82.2-3.3-6.2
    Table 1. Statistics of average strain at each measurement point during pouring
    Measurement pointStrain during filling /μεMeasurement pointStrain during filling /με
    MaximumAverageMinimumMaximumAverageMinimum
    1-7.3-40.8-68.8
    2-13.7-42.4-68.814-13.6-39.2-51.2
    3-1.5-27.8-49.813-7.7-59.9-90.8
    40.7-29.9-48.612-3.5-28.9-48.9
    5-0.5-23.1-43.5113.1-5.6-24.3
    6-4.2-21.7-42.5105.5-1.2-12.6
    75.4-12.4-37.794.7-7.4-21.7
    8-4.8-12.9-27.1
    Table 2. Statistics of average strain at each measurement point during filling
    Wu Jinghong, Ye Shaomin, Zhang Jiqing, Zhao Qing, Zhang Wenxuan. Structural Health Monitoring of Large-Section Tunnel of Jingxiong High-Speed Railway Based on Fiber Bragg Grating Monitoring Technology[J]. Laser & Optoelectronics Progress, 2020, 57(21): 210603