[2] ABDALJBBAR B A, RIAZ D M, ABBASI S A. On model selection for autocorrelated processes in statistical process control[J].Quality and Reliability Engineering International, 2017, 33(4):867-882.
[4] ALWAN L C.The problem of misplaced control limits[J].Journal of the Royal Statistical Society, 1995, 44(3):269-278.
[5] MONTGOMERY D C, MASTRANGELO C M.Some statistical process control methods for autocorrelated data[J].Quality Control & Applied Statistics, 1991, 36(3):569-570.
[6] RUNGER G, WILLEMAIN T.Batch-means control charts for autocorrelated data[J].IIE Transactions, 1996, 28(6):483-487.
[7] LI S Y, WANG W J. A study on the performance of lambda control chart for autocorrelated processes[C]//International Conference on Control Science and Systems Engineering (EI), 2016:124-127.
[9] ALWAN L, ROBERTS H. Time-series modeling for statistical process control[J].Journal of Business & Economic Statistics, 1988, 6(1):87-95.
[10] ZHANG N F. Detection capability of residual control chart for stationary process data[J].Journal of Applied Statistics, 1997, 24(4):475-492.
[11] WARDELL D G, MOSKOWITZ H, PLANTE R D.Control charts in the presence of data correlation[J].Mana-gement Science, 1992, 38(8):1084-1102.
[12] LIN W S W, ADAMS B M. Combined control charts for forecast-based monitoring schemes[J].Journal of Quality Technology, 1996, 28(3):289-301.