• BLASTING
  • Vol. 40, Issue 2, 75 (2023)
ZHANG Yan-jun1,*, LEI Mei-rong2, ZHANG Dong-rang1, and GOU Jing-guo1
Author Affiliations
  • 1[in Chinese]
  • 2[in Chinese]
  • show less
    DOI: 10.3963/j.issn.1001-487x.2023.02.011 Cite this Article
    ZHANG Yan-jun, LEI Mei-rong, ZHANG Dong-rang, GOU Jing-guo. Numerical Simulation of Small Hole Stemming under Blast Load[J]. BLASTING, 2023, 40(2): 75 Copy Citation Text show less
    References

    [2] FU Jun,HAO Ya-fei,CAO Jin-jun,et al.Research and application of large aperture blasting blocking technology optimization [J].Blasting,2019,36(4):150-154.(in Chinese)

    [4] LI Guo-ping,YANG Wei,WANG Hua,et al.Industrial experiment study on paving material for stemming blasting hole in open-pit bench blasting[J].Mining Research and Development,2016, 36(5):42-45.(in Chinese)

    [6] ZHANG Yan-jun,LEI Mei-rong.Analysis on block factors about drilling blasting[J].Coal Technology,2019,38(7):68-70.(in Chinese)

    [8] ZHANG Yan-jun,LEI Mei-rong,NING Zhang-xuan.Study on wedge stemming plug of blast hole[J].Coal Engeering,2015,47(1):60-65.(in Chinese)

    [10] LI Qi-yue,LIU Bing-chuan,CHEN Liang,et al.Deep hole blasting in a reasonable suppling hole plug length [J].Science and Technology Leader,2013,31(19):15-19.(in Chinese)

    [12] LI Yan-long, SHI Xiu-zhi, LIU Bo, et al.Experimental research on reasonable length of water stemming[J].Blasting,2015,32(2):11-38.(in Chinese)

    [14] ZHU Kuan,ZHONG Dong-wang,ZHOU Gui-song.Numerical simulation and experimental research on air spacer blocking blasting [J].Blasting,2022,39(1):43-50.(in Chinese)

    [16] OUYANG Jian,SHI Xiu-zhi,ZHANG Zong-guo,et al.Research on the reasonable filling length of the blasting charge hole for deep hole straight hole cutting [J].Blasting,2022,39(2):16-22.(in Chinese)

    [18] WANG Chen,WEN Zhong,CAO Meng-yu.Plug in the tunnel blasting effect and plug length calculation[J].Mining Technology,2011,11(5):118-120.(in Chinese)

    [20] ZHOU Zhi-qiang, YI Jian-zheng, CAI Jun-feng ,et al.Progress study on blasthole stemming and its action[J].Explosive Materials,2009,38(5):29-33.(in Chinese)

    [22] REN Shao-feng, YU Hong-bing, ZHAO Ming-sheng,et al.Study of influence of stemming length on cutting blasting effect in tunnel excavation[J].Blasting, 2017,34(2):51-54.(in Chinese)

    [24] GAO Wen-le,ZHOU Ao-bo,ZHANG Qiang.Optimization of driving parameters for hard rock roadway blasting [J].Blasting,2015,32(2):64-67,105.(in Chinese)

    [26] WANG Yang,SHI Xiu-zhi,GOU Yong-gang,et al.Research on the plugging effect of blasting holes in parallel double free-face rock mass [J].Vibration and Shock,2016,35(15):80-85.(in Chinese)

    [28] ZHANG Ping,YANG Ting-ming,CHU Bao-guang,et al.Experimental study on reasonable blocking length of medium and deep hole blasting [J].Copper Industry Engineering,2014,127(3):58-60.(in Chinese)

    [30] LIANG Rui,LU Yaru,ZHOU Wen-hai,et al.Research on the plugging effect and length of blasting holes in underground stopes [J].Chinese Journal of Underground Space and Engineering,2020,16(5):1546-1554.(in Chinese)

    [31] RIEDEL W.Beton unter dynamischen lasten:meso-und makromechanische modelle und ihre parameter [M].Fraunhofer IRB Verlag,2004.

    [32] HARTMANN T,PIETZSCH A,GEBBEKEN N.A hydrocode material model for concrete [J].Intemational Journal of Protective Structures,2010,1(4):443-468.

    ZHANG Yan-jun, LEI Mei-rong, ZHANG Dong-rang, GOU Jing-guo. Numerical Simulation of Small Hole Stemming under Blast Load[J]. BLASTING, 2023, 40(2): 75
    Download Citation