[3] ZHUO Zhen-li.Research on the supporting performance of tunnel invert structure[D].Xi′an:Chang′an University,2016.(in Chinese)
[5] WANG Ming-nian, WENG Han-min, LI Zhi-ye.Study on the mechanic behavior of tunnel invert[J].Chinese Journal of Geotechnical Engineering, 1996, 18(1):46-53.(in Chinese)
[7] WANG Chuan-wu,CHEN Li-jun,CHEN Jian-xun,et al.Research on bearing performance and safety of invert of large-span soft-rock highway tunnel[J].China Journal of Highway and Transport,2022,35(7):203-215.(in Chinese)
[9] ZHANG Yun-liang,CAO Wei,WANG Jian,et al.Blasting technique for controlling excessive and insufficient excavation in tunnel with horizontal layered rock mass[J].Journal of Railway Science and Engineering,2010,7(5):70-74.(in Chinese)
[11] WANG Hai-liang,HE Chuang.Control blasting technique of overbreak and underbreak under the limitation of steel arch in metro tunnel[J].Journal of Shandong University of Science and Technology,2016,35(5):49-54.(in Chinese)
[13] ZHANG Hao,XIE Ming-jun,WEI Zheng,et al.Research on application of overbreak-underbreak detection based on tunnel point cloud data[J].Journal of Zhejiang University of Technology,2021,49(5):539-545.(in Chinese)
[14] MOTTAHEDI A,SERESHKI F,ATAEI M.Overbreak prediction in underground excavations using hybrid ANFIS-PSO model[J].Tunnelling and Underground Space Technology,2018,80:1-9.
[16] MA Yuan-lei,HE Peng.Research and application of smooth blasting technique in tunneling through fault[J].Blasting,2020,37(4):59-62,165.(in Chinese)
[18] LIANG Dong-biao.Study on the influence of periphery hole blasting parameters on surrounding rock damage and overbreak and underbreak of tunnel[D].Chengdu:Southwest Jiaotong University,2019.(in Chinese)
[20] ZHANG Ji-chun,PAN Qiang,ZHENG Shuang-ying,et al.Technique of smooth blasting of highway tunnel with super-large section[J].Blasting,2018,35(4):52-57.(in Chinese)
[22] FENG Hai-bao,JIANG Wan-de,QU Li-li,et al.Over-break/shortbreak control technology for and cost analysis on rock tunnels constructed by drilling and blasting method:case study on tunnels on Jiujiang-Ruichang highway[J].Tunnel Construction,2012,32(6):887-891.(in Chinese)
[23] CHEN J,QIU W,ZHAO X,et al.Experimental and numerical investigation on overbreak control considering the influence of initial support in tunnels[J].Tunnelling and Underground Space Technology,2021,115:104017.