• BLASTING
  • Vol. 40, Issue 4, 66 (2023)
SONG Sen-sen1,2,* and HUO Run-ke1,2
Author Affiliations
  • 1[in Chinese]
  • 2[in Chinese]
  • show less
    DOI: 10.3963/j.issn.1001-487x.2023.04.009 Cite this Article
    SONG Sen-sen, HUO Run-ke. [J]. BLASTING, 2023, 40(4): 66 Copy Citation Text show less
    References

    [2] FANG Jun-bo,LIU Hong-zhen,ZHAI Jin-ying.Development and prospect of blasting technology for mountain-crossing tunnels[J].Tunnel Construction,2021,41(11): 1980-1991.(in Chinese)

    [4] DING Xiang.Research on the control technology of over-under-excavation of tunnel blasting in interbedded rock masses[J].Journal of Railway Engineering Society,2022,39(3): 75-80.(in Chinese)

    [6] XIE Fei-hong,Yu Chao-yang,DONG Jian-hui,et al.Mechanical response analysis of surrounding rock in over-excavated tunnel based on numerical simulation[J].Highway,2021,66(7): 332-337.(in Chinese)

    [8] LI Qi-yue,ZHAO Xin-hao,WEI Xin-ao,et al..Study and application of contour control blasting technology for large section tunnel[J].Gold Science and Technology,2019,27(3): 350-357.(in Chinese)

    [10] ZHANG Wan-zhi,XU Bang-shu,GE Yan-hui.et al.Optimization of cutting blasting parameters for full face excavation of hard rock tunnel[J].Blasting,2022,39(2): 94-99.(in Chinese)

    [12] YU Fei-fei,ZHANG Na,ZHANG Xian-tang,et al.Blasting parameters optimization and blasting forming of horizontal layer rock tunnel[J].Blasting,2019,36(1): 63-69.(in Chinese)

    [14] XU Bang-shu,ZHANG Wan-zhi,SHI Wei-hang,et al.Experimental study of parameters of tunneling blasting in jointed layered rock mass[J].Journal of China University of Mining & Technology,2019,48(6): 1248-1255.(in Chinese)

    [16] ZHANG Ji-chun,PAN Qiang,ZHENG Shuang-ying,et al.Technique of smooth blasting of highway tunnel with super-large section[J].Blasting,2018,35(4): 52-57.(in Chinese)

    [18] LIU Guo-qiang,LIU Bin,ZHANG Qing-ming,et al.Parameter optimization of smooth blast in karst tunnel and its application[J].Tunnel Construction,2021,41(S2): 50-57.(in Chinese)

    [19] KONONENKO M,KHOMENKO O,SAVCHENKO M,et al.Method for calculation of drilling-and-blasting operations parameters for emulsion explosives[J].Mining of Mineral Deposits,2019,13(3): 22-30.

    [21] ZOU Ding-xiang.Theory and technology of rock excavation for civil engineering[M].Singapore: Springer Singapore,2017.

    [23] GONG Zhong-jiang,CHAI Jing-yao,YANG Chang-geng.Construction technology of smooth blasting used in railway tunnel and its management practice[J].Tunnel Construction,2017,37(12): 1593-1599.(in Chinese)

    [25] WANG Zhen-hao.Smooth blasting technology of huangbaishan tunnel[J].Blasting,2022,39(2): 100-106.(in Chinese)

    [27] ZHANG Zhao-ran,CHEN Hua-yi,JIAO Wei-gang,et al.Rock breaking mechanism and blasting parameters of straight-hole cutting with empty-hole[J].Journal of China Coal Society,2020,45(S2): 791-800.(in Chinese)

    [28] ALLEN M R.An analysis of burn cut pull optimization through varying relief hole depths[D].Missouri University of Science and Technology,2014.

    [31] HE Guang-yi.Development of hydraulic blasting technology for tunnel excavation[J].Engineering Blasting,2021,27(5): 53-58.(in Chinese)