[2] WANG Shulei.Discussion on the blast technology in medium section tunnel[J].Railway Construction Technology,2009,174(4):5759,64.(in Chinese)
[4] PENG Limin.Traffic tunnel engineering[M].Changsha:Central South University Press,2003.(in Chinese)
[6] LANGEFORS U,KIHLSTROM B.Modern technology of rock blast[M].Beijing:Metallurgy Industry Press,1983.(in Chinese)
[7] SHAPRIO V Y.Efficiency of cut configuration in driving tunnels with a set of deep blast holes[J].Journal of Mining Science,1989,25(4):379386.
[9] ZONG Qi,ZHANG Guoyong.Study on some techniques of cutting blasting and smooth blasting of mediumdeep blasting in rock tunnel[J].Journal of Huainan Institute of Technology,2001,21(2):1821.(in Chinese)
[11] SHAN Renliang,HUANG Baolong,GAO Wenjiao,et al.Case studies of new technology application of quasiparallel cut blasting in rock roadway drivage[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(2):224232.(in Chinese)
[13] ZHANG Zhaoran,YANG Renshu.Multistep cutting technology and its application in rock roadways[J].Chinese Journal of Rock Mechanics and Engineering,2019,38(3):551559.(in Chinese)
[15] WANG Ping.Optimization of wedge cut blasting parameters in large section tunnel[D].Nanning:Guangxi University,2020.(in Chinese)
[17] YAN Gaowen.Wedge and straight hole cutting blasting technology of three arm rock drilling trolley in tunnel construction[J].China High and New Technology,2019(4):7779.(in Chinese)
[19] LI Peng,LIU Peng.Application of large diameter parallel hole cut blasting on small crosssection roadway excavation[J].Yunnan Metallurgy,2022,51(4):2227.(in Chinese)
[21] JI Liaoyuan.Application of new technology in construction of long tunnel with small section[J].Shaanxi Water Resources,2020(8):209210,213.(in Chinese)
[23] ZHANG Shaoran,CHEN Huayi,JIAO Weigang,et al.Rock breaking mechanism and blasting parameters of straighthole cutting with emptyhole[J].Journal of China Coal Society,2020,45(S2):791800.(in Chinese)
[25] WANG Yuanlai,SHI Xiuzhi,WANG Famin,et al.Optimization of blasting parameters of burn cut in underground mine[J].Mining and Metallurgical Engineering,2021,41(5):3640.(in Chinese)
[27] XIONG Liang,ZHENG Wenqiang.Optimization design and application of cutting slot in blasting excavation of roadway[J].Modern Mining,2018,34(2):7173.(in Chinese)
[29] YANG Renshu.Present status and outlook on safety and high efficient heading technology of mine rock roadway in China[J].Coal Science and Technology,2013,41(9):1823.(in Chinese)
[31] FENG Haibao,JIANG Wande,QU Lili,et al.Overbreak /shortbreak control technology for and cost analysis on rock tunnels constructed by drilling and blasting method:case study on tunnels on JiujiangRuichang Highway[J].Tunnel Construction,2012,32(6):887891.(in Chinese)
[32] LEE T,KIM D,SEO Y.The development of methods for minimizing the overbreak in tunnel blasting[C]∥Proceedings of the Annual Conference on Explosives and Blasting Technique.ISEE;1999,2003,2:5768.
[33] SMITH P D,VISMEG P,TEO L C,et al.Blast wave transmission along roughwalled tunnels[J].International Journal of Impact Engineering,1998,21(6):419432.
[35] WANG Xuguang.Blasting manual[M].Beijing:Metallurgical Industry Press,2010.(in Chinese)
[37] WANG Wei,HUAI Pingsheng,JIANG Shiliang.Efficient driving method for large section tunnel by burn cut blasting with uncharged holes[J].Blasting,2022,39(3):7681.(in Chinese)