[2] XING Guang-wu,GENG Peng.Complex environment thick wall brick chimney high incision blasting demolition[J].Mining Technology,2020,20(5): 167-169.(in Chinese)
[4] YANG Hui,YUAN Yi-shuo,CHAI Ya-bo,et al.Directional demolition blasting of a 180m high chimney in a complex environment [J].Engineering Blasting,2022,28(2): 84-92(in Chinese)
[6] WANG You-xin,YANG Tian-yun,ZHENG Gui-chu,et al.Xinhui Shuangshui Power Plant 100m high reinforced concrete chimney demolition blasting[J].Coal Mine Blasting,2019,37(4): 28-30.(in Chinese)
[8] HU Bin,YANG Sai-qun,LI Hong-wei,et al.Calculation and numerical simulation of blasting cutting angle of an ultra-high reinforced concrete chimney[J].Engineering Blasting,2022,28(1): 99-106.(in Chinese)
[10] HE Wu-yi,TAN Xue-gang.Study on blasting cut in demolition of tower tubular metal structure[J].Blasting,2007,24(1): 14-16.(in Chinese)
[12] JIN Ji-liang.The parameters of blasting cut for directional collapsing of high rise buildings and towering and structures[J].Engineering Blasting,2003,9(4): 1-6.(in Chinese)
[14] GONG Xiang-chao,ZHONG Dong-wang,HAN Fang,et al.Research of key parameters of blast cut in explosive demolition of reinforced concrete chimney[J].Blasting,2013,30(4): 32-35.(in Chinese)
[16] ZHANG Bao-gang,ZHAO Ming-sheng,YU Hong-bing,et al.Study on influence of cut angle on explosive demolition of cooling tower[J].Blasting,2018,35(1): 109-115.(in Chinese)
[18] LI Yu-qi,XIE Kang-he.Study on cut parameters of chimney demolition by controlled blasting[J].China Mining,2004,13(11): 76-79.(in Chinese)
[20] FU Ju-gen,JIANG Jian-nong,ZHANG Yu-ben.Theoretical calculation of notched height about tower building demolished by blasting[J].Engineering Blasting,2006,12(2): 56-58.(in Chinese)
[22] YAN Zhi-xin,YE Zhen-hui,LIU Pei-lin,et al.Collapsing process of high reinforced concrete chimney in blasting demolition[J].Journal of Vibration and Shock,2011,30(9): 197-201.(in Chinese)
[24] ZHENG Bing-xu,WEI Xiao-lin,CHEN Qing-shou.Mechanical analysis of cutting-support destabilization of high reinforced concrete chimney[J].Journal of Vibration and Shock,2007,26(S1): 3348-3354.(in Chinese)
[26] FEI Hong-lu,QIAN Qi-fei,LIU Yu,et al.Effect of cut shapes on dumping backward collapse of high chimney in demolition blasting[J].Engineering Blasting,2021,27(1): 53-61.(in Chinese)
[28] GAO Zhen-ru,ZHANG Jun-nan,WANG Song-jiang.Blast cut design and practice of chimney directional blasting[J].Blasting,2012,29(4): 80-82.(in Chinese)
[30] SUN Jin-san,XIE Xian-qi,JIA Yong-sheng,et al.Prediction of sinking down and early break in the air of reinforced concrete chimney during blasting demolition[J].Explosion and Shock Waves,2022,42(8): 160-174.(in Chinese)
[32] ZHANG Jian-ping,FEI Hong-lu,ZHANG Bei-long,et al.Principle and application of dynamic equilibrium in directional blasting of high chimney[J].Engineering Blasting,2016,22(6): 23-27.(in Chinese)
[34] GB50010—2010 Code for design of concrete structures[S].Beijing: China Architecture & Building Press,2010.(in Chinese)
[36] LIN Ze,ZHANG Shi-ping.Numerical simulation study on the removal of chimney with different blasting notch shape[J].Engineering Blasting,2017,23(4): 91-94.(in Chinese)
[38] WANG Gang.Numerical simulation and scheme design of blasting demolition of brick-concrete chimney in complex environment[J].Coal Mine Blasting,2022,40(2): 14-18.(in Chinese)
[40] SUN Fei,GUO Wen-hua,GU Yun,et al.Parameters design of blasting cut and pretreatment technology of chunky silo cluster[J].Explosive Materials,2021,50(1): 59-64.(in Chinese)