[2] YE Jian-jun, CHEN Fei, XIAO Jian-zhuang, et al.Green blasting demolition technology of reinforced concrete structures[J].Blasting,2019,36(3):90-97.(in Chinese)
[4] LIU Jiang-chao,GAO Wen-xue,ZHANG Sheng-hui.Selection and optimization of interval charge structure of surrounding holes in tunnel excavation blasting[J].Blasting,2021,38(3):38-44, 112.(in Chinese)
[6] YANG Ren-shu,WANG Yan-bing,ZHANG Zhao-ran,et al.New technology and application of cutting blasting in shaft and roadway engineering[J].Bulletin of National Natural Science Foundation of China,2022,36(1):120-127.(in Chinese)
[8] QIN Zhong-hu,HUANG Xiao-bin,WANG Zhen-chang,et al.Application of simple air-spacer on the deep-holeblasting of underground mine in Zijinshan[J].Mining Research and Development,2017,37(12):58-63.(in Chinese)
[10] XU Long-qing,ZHANG Zhong-lei,WANG Lin-gui,et al.Construction technology and management of large-scale excavation group blasting[J].Engineering Blasting,2022,28(4):44-50, 83.(in Chinese)
[12] YE Jian-jun,PENG Qing-bo,LIU Bing-bing,et al.Structure and method of sectional charging in Dowward hole, China:CN114353609A[P].2022-04-15.(in Chinese)
[14] CHANG Jian-ping,ZHANG Peng-fei,DUAN Jun,et al.Determination of millisecond blasting parameters and analysis of blasting effect in high-step hole[J].Metal Mine,2020(12):81-87.(in Chinese)
[16] PEI Bin,ZHANG Bo,FU Ming-yu.24 m high bench blasting technology in Barun mine[J].Modern Mining,2020,36(3):39-42.(in Chinese)
[18] TANG Jie-wei,LIU Tao,ZHENG Xiang,et al.On the action time of blasting load with decoupled charge[J].Hydropower and New Energy,2019,33(10):11-16.(in Chinese)
[20] ZHAO Ming-sheng,CHI En-an,WEI Xing.Application of vibration reduction technology by in-hole millisecond delay detonation in cutting excavation blasting[J].Mining Research and Development,2013,33(2):118-120.(in Chinese)
[22] LI Ting-chun,LIU Hong-qiang,WANG Chao.Study of millisecond blasting technology of shaft excavation by one-step deep-hole blasting[J].Rock and Soil Mechanics,2012,33(6):1742-1746.(in Chinese)
[24] HE Ting.Blasting technology for foundation pits of strongly developed karst area under complex environment[J].Engineering Blasting,2022,28(2):78-83, 92.(in Chinese)
[26] YANG Ren-shu,BAO Zhou-qi,WANG Yan-bing,et al.Application of digital electronic detonator in blasting excavation of rock roadway in high gas mine[J].Metal Mine,2022(7):27-34.(in Chinese)
[28] LIU Qing,KANG Qiang,ZHAO Ming-sheng.Numerical simulation and experiment research of in in-hole microsecond blasting[J].Mining Research and Development,2013,33(3):108-110, 121.(in Chinese)
[30] HU Hao-ran,LU Wen-bo,XI Hao,et al.Horizontal foundation surface excavation method under the protection of energy shaped and dissipation composite cushion[J].Chinese Journal of Rock Mechanics and Engineering,2016,35(S2):4129-4138.(in Chinese)
[32] LU Wen-bo,HU Hao-ran,YAN Peng,et al.Vertical borehole shock-reflection blasting technique and its application in foundation excavation[J].Chinese Journal of Rock Mechanics and Engineering,2018,37(S1):3143-3152.(in Chinese)
[34] XU Lian-sheng,WANG Zhi-zhong,YANG Zhi-fu.An uncoupled charge centering device for inclined Blasthole, China:CN202032958U[P].2011-11-09.(in Chinese)
[36] YE Jian-jun,CHENG Da-chun,SHU Da-qiang.Long dynamite charging bag and the method of using it for blasting hole charging, China:CN105627845A[P].2016-06-01.(in Chinese)
[38] YE Jian-jun,CHENG Da-chun,SHU Da-qiang.Umbrella shaped clamp hanger and the method of using it for blasting hole charging, China:CN106225614A[P].2016-12-14.(in Chinese)
[40] CHEN Yu-cheng,HUANG Xin,XU Zhen-hao,et al.A device for precise control of charge structure, Chian:CN207779244U[P].2018-08-28.(in Chinese)
[42] LIU Chao,WANG Yong-qiang.Water spacer used for interval charging in large diameter deep hole Blasting, China:CN217483369U[P].2022-09-23.(in Chinese)
[44] CHENG Da-chun,YE Jian-jun,MING Jun.The layout method of pre-buried axial pipes as blast holes forreinforced concrete column and the demolition blasting method, China:CN105571418B[P].2018-01-16.(in Chinese)
[46] CHENG Da-chun,YE Jian-jun,DONG Xiao-ke.The method of blasting demolition of reinforced concrete supporting beams and the explosive charging,hole plugging,and flying rock controlling structures, China:CN104215136B[P].2016-01-06.(in Chinese)
[48] YE Jian-jun,PENG Qing-bo,ZHANG Hong-yu,et al.Structure and construction method of subsection water coupling charge by hanging bags in holes, China:CN114264206A[P].2022-04-01.(in Chinese)