• BLASTING
  • Vol. 40, Issue 1, 100 (2023)
WU Faming1、*, DUAN Xingping1, XU Jinpeng1, YANG Zhaowei2, ZHOU Tao3, and PENG Zhengliang3
Author Affiliations
  • 1[in Chinese]
  • 2[in Chinese]
  • 3[in Chinese]
  • show less
    DOI: 10.3963/j.issn.1001-487x.2023.01.014 Cite this Article
    WU Faming, DUAN Xingping, XU Jinpeng, YANG Zhaowei, ZHOU Tao, PENG Zhengliang. Design and Construction of Demolition Blasting for Cofferdam at Tailrace Outlet of Baihetan Hydropower Station[J]. BLASTING, 2023, 40(1): 100 Copy Citation Text show less
    References

    [2] QIAO Ping,BU Junrui,ZHANG Weiming,et al.Explosive demolition technology of cofferdam removal in complex environment[J].Blasting,2016,33(4):9093.(in Chinese)

    [4] WANG Hongbin,WANG Xiao.Explosive demolition technology analysis of diversion tunnel cofferdam at left bank in Baihetan Hydropower Station[J].Blasting,2017,34(1):108112.(in Chinese)

    [6] LIU Meishan,LI Dan,PENG Cuiling,et al.Analysis of key problems of explosive demolition for cofferdam of water conveyance tunnel on large hydropower station[J].Blasting,2006,23(2):8084.(in Chinese)

    [8] SUN Yunfeng,LI Chong,MENG Tao,et al.Demolition blasting for cofferdam and reserved rock ridge of intake in a water diversion project[J].Engineering Blasting,2020,26(3):3844.(in Chinese)

    [10] PENG Shaoyin.Demolish blasting technology on inlet cofferdam of left diversion tunnel in Wudongde Hydropower Project[J].Electric Power Survey & Design,2019(12):4550,74.(in Chinese)

    [12] LIU Bensen,RONG Jinsong,SUN Quan.Technlogy for inlet cofferdam demolition of diversion tunnel construction on left bank of Wudongde Hydropower Station[J].Water Resources and Hydropower Engineering,2016,47(S2):113116.(in Chinese)

    [14] LIAO Chenglin,YANG Yuyin.Controlled blasting technique for cofferdam removal at tunnel exit[J].Water Sciences and Engineering Technology,2020(3):4449.(in Chinese)

    [16] LIU Yu,XIAO Dengyong,PENG Dayong,et al.Blasting demolition of reserved rock ridge in diversion tunnel inlet[J].Engineering Blasting,2016,22(3):5860,64.(in Chinese)

    [18] LIU Meishan,ZHANG Zhengyu,LI Yongchi,et al.Blasting demolition of cofferdam inlet of water diversion tunnel at Goupitan Hydropower Station[J].Engineering Blasting,2005,11(1):2529.(in Chinese)

    [20] LIU Meishan,ZHANG Zhengyu,SHEN Siyuan,et al.Explosive demolition of cofferdam and rockdyke of water conveyance tunnelon of Xiaowan Hydropower Station[J].Water power,2004,30(10):4547.(in Chinese)

    [22] LI Hantao,CHEN Wenke,WANG Hui,et al.Demolition blasting of rock bar cofferdam at tail water of underground powerhouse of Wunonglong Hydropower Station[J].Electric Power Survey & Design,2018(12):5155.(in Chinese)

    [24] ZHAO Zhongyu,LIANG Xiangqian,WEN Xinping.Blasting demolition and safety control for rock ridge of Yumenkou Extension Pumping Station[J].Engineering Blasting,2017,23(4):8285.(in Chinese)

    [26] YUAN Jiangxia,XU Yucai.The demolition blasting of the reserved rock ridge cofferdam for the intake of circulating water of Middle Yellow Projection[J].China Rural Water and Hydropower,2020(8):211213,220.(in Chinese)

    [28] ZHANG Wenxuan,ZHANG Zhenyu,FAN Changyu,et al.Explosive demolition of cofferdam and rockdyke of water conveyance tunnel on Dachaoshan Hydropower Station[J].Blasting,2000,17(S1):207210.(in Chinese)

    [30] GUO Shiming,WANG Wenhui,LIU Hua,et al.Test and study on the blasting removal of the cofferdam in the tailrace mouth of Dachaoshan Hydropower Station[J].Water power,2001(12):2629,67.(in Chinese)

    [32] LI Quan.Analysis and comparison of several calculation formulas of specific charge underwater drilling blasting[J].Blasting,2012,29(1):9497.(in Chinese)

    [34] ZHANG Zhibo,LI Chunjun,LI Hongyong,et al.Application of air bubble purdah in the damping measure in the underwater blasting[J].Blasting,2003,20(2):7576,89.(in Chinese)

    [36] CHEN Ming,ZHONG Quan,LU Wenbo,et al.Study on water flow impact residue technology of explosive demolition of diversion tunnel intake cofferdam[J].Blasting,2010,27(3):7376,80.(in Chinese)

    [38] LI Jinhe,LIU Meishan.Basting demolition technology and effect analysis of the diversion tunnel cofferdam in Xiluodu Hydropower Station[J].Engineering Blasting,2011,17(3):5357.(in Chinese)

    [40] ZHANG Zhongwei,REN Ge,LI Hongtao.Explosive demolition of intake cofferdam of diversion tunnel on Jingping ⅡHydropower Station[J].Blasting,2011,28(4):7780.(in Chinese)

    [42] SHAO Xiaoning,ZHANG Daozhen,ZHOU Enquan,et al.Demolition blasting of reserved rock ridge cofferdam for intake of circulating water of units in electric power plant[J].Engineering Blasting,2014,20(3):2528.(in Chinese)

    WU Faming, DUAN Xingping, XU Jinpeng, YANG Zhaowei, ZHOU Tao, PENG Zhengliang. Design and Construction of Demolition Blasting for Cofferdam at Tailrace Outlet of Baihetan Hydropower Station[J]. BLASTING, 2023, 40(1): 100
    Download Citation