[2] QIAO Ping,BU Junrui,ZHANG Weiming,et al.Explosive demolition technology of cofferdam removal in complex environment[J].Blasting,2016,33(4):9093.(in Chinese)
[4] WANG Hongbin,WANG Xiao.Explosive demolition technology analysis of diversion tunnel cofferdam at left bank in Baihetan Hydropower Station[J].Blasting,2017,34(1):108112.(in Chinese)
[6] LIU Meishan,LI Dan,PENG Cuiling,et al.Analysis of key problems of explosive demolition for cofferdam of water conveyance tunnel on large hydropower station[J].Blasting,2006,23(2):8084.(in Chinese)
[8] SUN Yunfeng,LI Chong,MENG Tao,et al.Demolition blasting for cofferdam and reserved rock ridge of intake in a water diversion project[J].Engineering Blasting,2020,26(3):3844.(in Chinese)
[10] PENG Shaoyin.Demolish blasting technology on inlet cofferdam of left diversion tunnel in Wudongde Hydropower Project[J].Electric Power Survey & Design,2019(12):4550,74.(in Chinese)
[12] LIU Bensen,RONG Jinsong,SUN Quan.Technlogy for inlet cofferdam demolition of diversion tunnel construction on left bank of Wudongde Hydropower Station[J].Water Resources and Hydropower Engineering,2016,47(S2):113116.(in Chinese)
[14] LIAO Chenglin,YANG Yuyin.Controlled blasting technique for cofferdam removal at tunnel exit[J].Water Sciences and Engineering Technology,2020(3):4449.(in Chinese)
[16] LIU Yu,XIAO Dengyong,PENG Dayong,et al.Blasting demolition of reserved rock ridge in diversion tunnel inlet[J].Engineering Blasting,2016,22(3):5860,64.(in Chinese)
[18] LIU Meishan,ZHANG Zhengyu,LI Yongchi,et al.Blasting demolition of cofferdam inlet of water diversion tunnel at Goupitan Hydropower Station[J].Engineering Blasting,2005,11(1):2529.(in Chinese)
[20] LIU Meishan,ZHANG Zhengyu,SHEN Siyuan,et al.Explosive demolition of cofferdam and rockdyke of water conveyance tunnelon of Xiaowan Hydropower Station[J].Water power,2004,30(10):4547.(in Chinese)
[22] LI Hantao,CHEN Wenke,WANG Hui,et al.Demolition blasting of rock bar cofferdam at tail water of underground powerhouse of Wunonglong Hydropower Station[J].Electric Power Survey & Design,2018(12):5155.(in Chinese)
[24] ZHAO Zhongyu,LIANG Xiangqian,WEN Xinping.Blasting demolition and safety control for rock ridge of Yumenkou Extension Pumping Station[J].Engineering Blasting,2017,23(4):8285.(in Chinese)
[26] YUAN Jiangxia,XU Yucai.The demolition blasting of the reserved rock ridge cofferdam for the intake of circulating water of Middle Yellow Projection[J].China Rural Water and Hydropower,2020(8):211213,220.(in Chinese)
[28] ZHANG Wenxuan,ZHANG Zhenyu,FAN Changyu,et al.Explosive demolition of cofferdam and rockdyke of water conveyance tunnel on Dachaoshan Hydropower Station[J].Blasting,2000,17(S1):207210.(in Chinese)
[30] GUO Shiming,WANG Wenhui,LIU Hua,et al.Test and study on the blasting removal of the cofferdam in the tailrace mouth of Dachaoshan Hydropower Station[J].Water power,2001(12):2629,67.(in Chinese)
[32] LI Quan.Analysis and comparison of several calculation formulas of specific charge underwater drilling blasting[J].Blasting,2012,29(1):9497.(in Chinese)
[34] ZHANG Zhibo,LI Chunjun,LI Hongyong,et al.Application of air bubble purdah in the damping measure in the underwater blasting[J].Blasting,2003,20(2):7576,89.(in Chinese)
[36] CHEN Ming,ZHONG Quan,LU Wenbo,et al.Study on water flow impact residue technology of explosive demolition of diversion tunnel intake cofferdam[J].Blasting,2010,27(3):7376,80.(in Chinese)
[38] LI Jinhe,LIU Meishan.Basting demolition technology and effect analysis of the diversion tunnel cofferdam in Xiluodu Hydropower Station[J].Engineering Blasting,2011,17(3):5357.(in Chinese)
[40] ZHANG Zhongwei,REN Ge,LI Hongtao.Explosive demolition of intake cofferdam of diversion tunnel on Jingping ⅡHydropower Station[J].Blasting,2011,28(4):7780.(in Chinese)
[42] SHAO Xiaoning,ZHANG Daozhen,ZHOU Enquan,et al.Demolition blasting of reserved rock ridge cofferdam for intake of circulating water of units in electric power plant[J].Engineering Blasting,2014,20(3):2528.(in Chinese)