• BLASTING
  • Vol. 42, Issue 1, 10 (2025)
NI Hong-tao1, HUANG Yue-jun2,*, ZHAO Zhen-fu1, HU Xue-zhong1, and CHEN Ming2
Author Affiliations
  • 1Sinohydro Bureau 11 Co., Ltd., Zhengzhou 450001, China
  • 2State Key Laboratory of Water Resources Engineering and Management, Wuhan University, Wuhan 430072, China
  • show less
    DOI: 10.3963/j.issn.1001-487x.2025.01.002 Cite this Article
    NI Hong-tao, HUANG Yue-jun, ZHAO Zhen-fu, HU Xue-zhong, CHEN Ming. Blasting Vibration Control on Freshly Poured Concrete of Intake Tower of Diversion Tunnel at DBDP Hydropower Station[J]. BLASTING, 2025, 42(1): 10 Copy Citation Text show less
    References

    [5] QIN Qing-hua, ZHANG Jun. Vibration control of blasting excavation of large cross-section highway tunnel over metro line[J]. Arabian Journal of Geosciences, 2020, 13(17): 69-73.

    [6] KEITA I, KIMIHIRO H, JUNICHI N, et al. Reduction of tunnel blasting induced ground vibrations using advanced electronic detonators[J]. International Journal of the JSRM, 2022, 18(1): 1-4.

    [15] ANDERSON D A. A method site-specific prediction and control of ground vibration from blasting[C]//Proceedings of the 1st Mini-Symposium on Explosives and Blasting Research, 1985: 28-42.

    NI Hong-tao, HUANG Yue-jun, ZHAO Zhen-fu, HU Xue-zhong, CHEN Ming. Blasting Vibration Control on Freshly Poured Concrete of Intake Tower of Diversion Tunnel at DBDP Hydropower Station[J]. BLASTING, 2025, 42(1): 10
    Download Citation