• Journal of Radiation Research and Radiation Processing
  • Vol. 41, Issue 4, 040602 (2023)
Fei LUAN1,2, Chunhua CHEN1,*, Fang RUAN1,2, Yuan CHENG1,2..., Jingxian ZHU1 and Jianye WANG1|Show fewer author(s)
Author Affiliations
  • 1Hefei Institutes of Physical Science, Chinese Academy of Sciences, Hefei 230031, China
  • 2University of Science and Technology of China, Hefei 230026, China
  • show less
    DOI: 10.11889/j.1000-3436.2022-0128 Cite this Article
    Fei LUAN, Chunhua CHEN, Fang RUAN, Yuan CHENG, Jingxian ZHU, Jianye WANG. Influence of human factors on emergency evacuation efficiency of nuclear power plant accident[J]. Journal of Radiation Research and Radiation Processing, 2023, 41(4): 040602 Copy Citation Text show less
    Verification flow chart of nuclear emergency evacuation prediction model
    Fig. 1. Verification flow chart of nuclear emergency evacuation prediction model
    Logistic regression model building flow chart
    Fig. 2. Logistic regression model building flow chart
    Flow chart of multiple Logistic regression model building
    Fig. 3. Flow chart of multiple Logistic regression model building
    Partial evacuation roadmap
    Fig. 4. Partial evacuation roadmap
    Wind roses over Dapeng Peninsula
    Fig. 5. Wind roses over Dapeng Peninsula
    变量变量名赋值情况
    Variable

    Name of

    variable

    Case of assignment
    年龄/岁 AgeX118~25=0; 26~35=1; 36~55=2; >55=3
    性别 GenderX2男=0;女=1 Male=0; Female=1
    职业 ProfessionalX3

    学生=0;技术人员=1;服务业人员=2;生产运输人员=3;其他=4

    Students=0; Technical personnel=1; Service workers=2; Transportation personnel=3; Other=4

    学历 EducationX4

    专科=0;本科=1;研究生=2;其他=3

    Specialized subject=0; Undergraduate course=1; Graduate student=2; Other=3

    是否购买过核安全相关保险

    Has purchased nuclear safety related insurance

    X5

    买过=0;没买过=1

    Bought=0; Didn't buy it=1

    参加过的核应急疏散演习次数/次

    Number of nuclear emergency evacuation drills participated

    X60=0; 1=1; 2=2; >3=3

    对核应急疏散的了解情况

    Knowledge of nuclear emergency evacuation

    X7不了解=0;有一定了解=1;基本了解=2;Out of touch=0; Have some understanding=1; Basic understanding=2
    家中有无核应急防护措施 The home has non-nuclear emergency protection measuresX8

    没有=0;有=1

    No=0; Yes=1

    知晓周围辐射避难所数量/个

    Know the number of radiation shelters around

    X90=0; 1=1; 2=2; >3=3
    Table 1. Chi-square test and Logistic regression model of independent variable assignment
    变量变量名赋值情况
    Variable

    Name of

    variable

    Case of assignment

    是否给政府提供核疏散意见

    Whether to provide the government with nuclear evacuation advice

    Y1

    会=0;不会=1

    Yes=0; No=1

    听到核事故疏散警报后反应

    Reaction after hearing evacuation warning of nuclear accident

    Y2

    立即撤退=0;等待救援=1

    Get out at once=0; Waiting for rescue=1

    核应急疏散中发生拥挤选择

    Crowded options occur in nuclear emergency evacuation

    Y3

    排队等待=0;寻找其他通道=1

    Wait in line=0; Find another way=1

    倾向的辐射避难所选择

    Preference for radiation shelter selection

    Y4

    露天避难所=0;封闭避难所=1

    Open shelter=0; Closed shelter=1

    核事故疏散路线选择

    Nuclear accident evacuation route selection

    Y5

    指示疏散路线=0;随机疏散路线=1

    Indicated evacuation route=0; Random evacuation route=1

    认为核应急疏散所需的时间 / h

    The time considered necessary for a nuclear emergency evacuation

    Y6<1=0; 1~5=1; 6~12=2; >24=3

    对周围核设施是否有足够信任

    Have enough trust in the surrounding nuclear facilities

    Y7

    有=0;没有=1

    Yes=0; No=1

    Table 2. Dependent variable assignment in Chi-square test and Logistic regression model

    自变量

    Independent variable

    因变量 Dependent variable
    Y1Y2Y3Y4Y5Y6Y7
    X10.4500.9650.4500.1190.8500.333<0.01
    X20.9270.8410.902<0.010.3320.8440.282
    X30.7870.0860.9630.0980.5940.2860.566
    X40.1810.3870.6120.4720.0680.4410.160
    X5<0.010.0540.0770.1210.3110.2520.028
    X6<0.010.2000.1100.0200.2650.6500.127
    X7<0.010.4430.0400.0320.434<0.010.087
    X8<0.010.150<0.010.1210.7560.6690.067
    X9<0.010.3500.6260.3670.7430.4640.082
    Table 3. Pearson chi-square test significance P-value results (single factor)

    自变量

    Independent variable

    因变量Dependent variable
    Y1Y2Y3Y4Y5Y7
    X11.395
    X2-1.110
    X3-
    X4-
    X52.519-0.858
    X6-0.855-1.480
    X7-1.522-1.104-0.787
    X8-2.191-0.831
    X9-0.797
    常量 Constant3.2331.9690.979-2.701
    Table 4. Regression coefficient analysis results in binary Logistic regression model

    个人预估疏散时间Y6

    Personal estimate of evacuation time

    对当地疏散的了解情况X7

    Knowledge of local evacuations

    显著性P

    Significance

    回归系数B

    Coefficient of

    regression

    OR
    1~5 h之间 Between 1 and 5 hoursX7= 00.004-1.9620.141
    X7= 10.032-1.4000.247
    X7= 2
    6~12 h之间 Between 6 and 12 hoursX7= 00.011-2.1850.113
    X7= 10.011-2.0150.133
    X7= 2
    1 d以上 More than one dayX7= 00.220-1.6740.188
    X7= 10.059-2.8900.056
    X7= 2
    Table 5. Table of the significant influence of different variables on Y6

    公交车路线

    Bus route

    路线长度 / km

    Length of route

    路线参数

    Parameter of route

    滨海花园—家家乐百货附近小区

    Binhai Garden — the neighborhood near the department store

    27.0Us= 50、a1 = 1.4、a2= 1.88、a3= 6.97
    15.1Us= 50、a1 = 1.4、a2= 1.88、a3= 6.97
    16.0Us=50、a1= 1.4、a2= 1.88、a3= 6.97

    私家车路线

    Private car route

    路线长度 / km

    Length of route

    路线参数

    Parameter of route

    滨海花园—家家乐百货附近小区

    Binhai Garden — the neighborhood near the department store

    15.4Us= 80、a1= 0.95、a2= 1.88、a3= 6.97
    15.4Us=80、a1= 0.95、a2= 1.88、a3= 6.97
    18.5Us=80、a1= 0.95、a2= 1.88、a3=6.97
    Table 6. Evacuation route parameters for private and public vehicles

    天气条件

    Weather conditions

    交通容量减弱因子 / %

    Traffic capacity attenuation factor

    速度减弱因子 / %

    Velocity weakening factor

    正常 Normal100100
    不利—大雨 Negative— Heavy rain9050
    不利—大雪或结冰 Negative— Heavy snow or ice8550
    不利—大雾 Negative — Fog7550
    Table 7. Road traffic attenuation factor map under different meteorological conditions

    私家车总交通负荷/(pcu∙h-1

    Total traffic load of private cars

    最快疏散时间道路交通负荷/(pcu∙h-1

    Fastest evacuation time road traffic load

    平均疏散时间t / h

    Time of evacuation

    公交车总交通负荷/(pcu∙h-1

    Total bus traffic load

    最快疏散时间道路交通负荷 /(pcu∙h-1

    Fastest evacuation time road traffic load

    平均疏散时间t/ h

    Time of evacuation

    0.8570.250.6701.5600.00
    0.590.620.955
    0.000.93
    1.7140.681.4530.00
    0.680.7180.580.955
    0.340.87
    2.5710.771.3470.00
    1.021.0750.400.955
    0.770.94
    Table 8. The fastest evacuation time route table of different vehicle types
    Fei LUAN, Chunhua CHEN, Fang RUAN, Yuan CHENG, Jingxian ZHU, Jianye WANG. Influence of human factors on emergency evacuation efficiency of nuclear power plant accident[J]. Journal of Radiation Research and Radiation Processing, 2023, 41(4): 040602
    Download Citation