• High Power Laser and Particle Beams
  • Vol. 35, Issue 12, 124001 (2023)
Mingyang Huang1、2、3、4, Shouyan Xu1、2, Xin Qi1、2, and Sheng Wang1、2、3、4
Author Affiliations
  • 1Institute of High Energy Physics, Chinese Academy of Sciences, Beijing 100049, China
  • 2Spallation Neutron Source Science Center, Dongguan 523808, China
  • 3University of Chinese Academy of Sciences, Beijing 100049, China
  • 4Key Laboratory of Particle Acceleration Physics & Technology, Chinese Academy of Sciences, Beijing 100049, China
  • show less
    DOI: 10.11884/HPLPB202335.230110 Cite this Article
    Mingyang Huang, Shouyan Xu, Xin Qi, Sheng Wang. Beam extraction commissioning and extraction beam loss optimization for China Spallation Neutron Source accelerator[J]. High Power Laser and Particle Beams, 2023, 35(12): 124001 Copy Citation Text show less
    Layout of the CSNS extraction system
    Fig. 1. Layout of the CSNS extraction system
    Control system of the extraction timing
    Fig. 2. Control system of the extraction timing
    Current curves of 8 Kickers after the timing calibration
    Fig. 3. Current curves of 8 Kickers after the timing calibration
    Layout of the beam extraction process
    Fig. 4. Layout of the beam extraction process
    Time structure of the injection beam
    Fig. 5. Time structure of the injection beam
    Beam distribution on the target
    Fig. 6. Beam distribution on the target
    Measurement results of the leakage field for the Lambertson magnet
    Fig. 7. Measurement results of the leakage field for the Lambertson magnet
    Beam measurement results of the leakage field for the Lambertson magnet
    Fig. 8. Beam measurement results of the leakage field for the Lambertson magnet
    Measurement results of actual bunch length when the beam power on the target is 140 kW
    Fig. 9. Measurement results of actual bunch length when the beam power on the target is 140 kW
    Measurement results of 8 Kicker waveforms
    Fig. 10. Measurement results of 8 Kicker waveforms
    Variation diagrams of Kicker waveform
    Fig. 11. Variation diagrams of Kicker waveform
    Large dose rate hotspot at the Lambertson magnet entrance
    Fig. 12. Large dose rate hotspot at the Lambertson magnet entrance
    Neutron detector (R3MB03INBLM) measurement results varying with the collimator vertical acceptance
    Fig. 13. Neutron detector (R3MB03INBLM) measurement results varying with the collimator vertical acceptance
    Mingyang Huang, Shouyan Xu, Xin Qi, Sheng Wang. Beam extraction commissioning and extraction beam loss optimization for China Spallation Neutron Source accelerator[J]. High Power Laser and Particle Beams, 2023, 35(12): 124001