• BLASTING
  • Vol. 40, Issue 1, 124 (2023)
LI Jieming*
Author Affiliations
  • [in Chinese]
  • show less
    DOI: 10.3963/j.issn.1001-487x.2023.01.017 Cite this Article
    LI Jieming. Analysis on Blasting Technology of Insitu Collapse of Highrise Cooling Tower[J]. BLASTING, 2023, 40(1): 124 Copy Citation Text show less
    References

    [2] ZHAI Guofeng,TAN Ling.Design and analysis of blasting demolition of hyperbolic cooling tower[J].Blasting,2012,29(4):8789,139.(in Chinese)

    [4] JIANG Tiansheng,WANG Zhenyi,JIANG Yuefei.Blasting demolition of 105 m cooling tower in Chifeng Yuanbaoshan Power Plant[J].Blasting,2013,30(3):8890,134.(in Chinese)

    [6] FEI Honglu,GAO Jianjun,ZHANG Chaoyi,et al.Study on the disintegration law of cooling tower wall in blasting demolition[J].Blasting,2019,36(4):8695.(in Chinese)

    [8] XU Pengfei,TANG Ying,ZHANG Yingcai,et al.Study on collapse and stress failure process of high unloading groove notch blasting demolition of cooling tower[J].Blasting,2019,36(4):96102,107.(in Chinese)

    [10] BIAN Zuoqing,ZHANG Jiyun,GAO shuaijie,et al.Application of high unloading groove technology in blasting demolition of 100 m high cooling tower[J].Modern Mining,2018,34(7):197199.(in Chinese)

    [12] ZHANG Baogang,ZHAO Mingsheng,YU Hongbing,et al.Study on the influence of notch angle on blasting demolition of cooling tower[J].Blasting,2018,35(1):109115.(in Chinese)

    [14] LIU Hui,CAO Juan,LIU Ruihua.Application of controlled blasting technology in blasting demolition of hyperbolic cooling tower[J].Value Engineering,2013,32(31):13.DOI:10.14018/j.cnki.cn131085/n.2013.31.081.(in Chinese)

    [16] GAO Wenle,LI Kunpeng,LIU Zhicheng,et al.Study on the influence of the number of load reduction slots on the collapse effect of hyperbolic cooling tower[J].Blasting,2020,37(4):116126.(in Chinese)

    [18] BAI Xiaoyang,Fan Yongli.Study on controlled blasting technology and hazard control of large cooling tower[J].Modern Manufacturing Technology and Equipment,2021,57(5):116117.DOI:10.16107/j.cnki.mmte.2021.0389.(in Chinese)

    [20] FU Tianjie,WANG Quanjie,LIU Gang.Controlled blasting demolition of 123 m hyperbolic cooling tower[J].Blasting,2012,29(3):8285.(in Chinese)

    [22] SHEN Wensheng,LI Jieming,HUANG Lifeng,et al.Discussion on the shape selection of notch directional window in blasting demolition of cooling tower[C]∥New Blasting Technology in China III,2012:733739.(in Chinese)

    LI Jieming. Analysis on Blasting Technology of Insitu Collapse of Highrise Cooling Tower[J]. BLASTING, 2023, 40(1): 124
    Download Citation